Control
Micro-Epsilon
2 hour meeting with Christian: main outcome is to hold a kick-off meeting with Christian and Wilfried in June
LK Metrology
Geert indicated they might have a project involving a 6DOF tracking, to be continued
API
Good talk with Joe , who was very positive and aimed at involving me more with Ladar integrations. Remi, now director for Europe, was spiky/frustrated at not having any results on past collaborations. (hey, I'm not a sales guy).
Joe also pointed at TPR for rechecking if they are interested in reselling API equipment.
So action points:
- call John Marson again to get some air on current situation and take contact with French guy
- contact Roger
- Brunson interface I'll do via Sven
Nasa
Nasa reported a problem with a 6 marker rigid body where 1 marker moved and needed to be taken out.
This turns out to be non-trivial, just deleting in a data view is not possible, I ended up with exporting it to CTrack 1.9 format, edit the xml file and re-import and recreate the 6Dof calculation